VISION
Our Vision is to become the Leader in Indian Rail Infra.
MISSION
Our Mission is to Pioneer Excellence in Rail Infra for Nation Building.
OUR ONGOING PROJECTS
Project Description
Contract Value in Rupees (Inc Tax)
Employer Name
Provision of El based Automatic Signalling with continuous track circuiting and other associated works including suitable indoor alteration in electronic interlocking/RRI/PI Stations enroute in Jhansi (inc.-Gwalior (incl.) Section of Jhansi Division of North Central Railway"
579,825,000
RVNL
Survey, Design, Supply, Installation, Testing and Commissioning of 4-Aspect Automatic Block Signalling with Dual Multi Section Digital Axle Counter and other Associated works along with suitable alterations in Electronic interlocking /RRI/PI at stations on Double line (RE) Section between Godhara (Excluding) to Dahod (Excluding) (71.83 RKm) Of Ratlam Division Western Railway.
796,744,194
Western Railway
Signalling and Telecommunication work for provision of Automatie block signalling on Khapri-Sewagram Section of Nagpur Division" Central Railway
461,954,656
RVNL
​Provision of El based Automatic Signalling with continuous track circuiting and other Associated work along with suitable indoor alterations in electronic interlocking/RRI/PI stations enroute in Dhaulpur-Gwalior Section of Jhansi division of North Central Railway
402,500,000
RVNL
Design, supply, installation, testing and commissioning of four aspect Automatic Signalling with Dual Multi Section Digital Axle Counters and other Associated works along with suitable alterations in Electronic interlocking /RRI/PI stations enroute between Sabarmati B -Kalol ( 20.57 Km) double line section of Ahmedabad division of Western Railway
309,354,486
Western Railway
Supply, Installation, Testing & Commissioning of bought out scope at Tata Kalinganagar Phase-1&2
212,688,334
Siemens
"S&T work (Indoor & Outdoor) for provision of Distributed Electronic Interlocking at Ludhiana station alongwith block working and associated telecom work in c/w Ludhiana- Mullanpur doubling of Ferozpur Division of Northern Railway"
191,608,308
Northern Railway
Design, Supply, Installation, Programming, Testing, and Commissioning of New Hot Standby Electronic Interlocking System, With Supply, Installation, Testing, and Commissioning of Various Indoor and Outdoor Signalling Systems & Gears including Dual MSDAC at three Station (KATWARA, PITOL, and JHABUA) along with Modification, Alteration, Augmentation, Design, Manufacture, Supply, Installation, Testing & Commissioning of Existing Distributed Electronic Interlocking System of MEDHA Make at DAHOD Station for shifting of El hardware of Dahod B-Cabin and interlocking of Goods yard of Dahod in connection with Dahod -Indoor New BG line of Ratlam Division, Western Railway ( Madhya Pradesh and Gujarat state ).
180,933,546
Western Railway
Provision of EI based Automatic Signalling with Dual Detection by MSDAC and other Associated works along with suitable indoor alterations in EI/RRI/PI Stations enroute in AF-JAB- TDL Section of Agra & Prayagraj Division
176,550,832
North Central Railway
Provision of Outdoor signalling work including supply of materials, installation, testing & commissioning of Ballarshah and Vivekanand Nagar stations, Alteration in existing RRI/PI at Ballarshah & Vivekanand Nagar station, and Indoor work of New Electronic Interlocking in Majri station (Distributed EI), Shifting of Interlocked Gates & IBS during phase working in connection with provision of 3rd Line in Wardha -Ballarshah section of Nagpur Division of Central Railway
174,378,487
Central Railway
S and Twork (Indoor and Outdoor) for provision of Centralised Electronic Interlocking at Malipur & Jafarganj Stations along with altera on in Siemens Make EI at Tulsi Nagar station and Medha Make EI at Akbarpur
station in c/w double line work between Jaunpur-Tanda section and addition and alteration in RRI (British Type) of Zafrabad station and outdoor signalling work in c/w provision of chord line between Jaunpur Jn. And Jaunpur City of LKO Division of Northern Railway.
131,959,763
Northern Railway
Provision of Electronics Interlocking at BRRI & New Lalitpur Townstation and EI alteration at DWA & LAR station in connection with LAR-BRRI doubling with flyover work & DWA-BRRI chord line work (22.87Kms)".
117,076,031
North Central Railway
Prayagraj Division: S&T works at 02 numbers of new stations namely Awagarh & Shivala Tehu and EI modifications work at BRN and ETH stations on BRN-Etah section in connection with linking of JVUNL Thermal Power station Etah
108,394,165
North Central Railway
Design, Programming, Installation, Supply, Testing and Commissioning of Electronic Interlocking (EI) System Conforming to RDSO Specification No. RDSO/SPN/192/2005 or Latest (With Latest Amendment if any) as per SIP along with Indoor & Outdoor Work Including Part Supply of Materials at Gomtinagar Coaching Complex in Lucknow Division of N.E. Railway
104,342,170
North Eastern Railway
Outdoor and Indoor Work with part supply of Signalling and telecom materials in Connection with the work of Replacement of signalling gears with Distributed EI at Delhi Shahdara station (DSA) of Delhi Division, Northern Railway".
104,194,801
Northern Railway
CLIENTS
OUR ASSOCIATES
CSR
Passionate and Committed to Giving Back to India.
FY | Amount | Receipts |
---|---|---|
2019 - 20 | 2121200 | View Receipt |
2020 - 21 | 1378500 | View Receipt |
2023 - 24 | 1,681,000 | View Receipt |
2022 - 23 | 731,000 | View Receipt |
2021 - 22 | 500,000 | View Receipt |
COME WORK WITH US
Join the Team
​
Contact Us
Offices.
Headquarters
B-48, Sector 14, Noida - 201301
​New Delhi
Flat No. 156, Akash Darshan Apartment
Mayur Vihar Ph-1, New Delhi -110091.
GSTIN- 07AAKCC1790L1ZA
​Uttarakhand
07, Geeta Nagar,
Haridwar Road, Uttarakhand - 249201.
GSTIN-05AAKCC1790L1ZE
​
Uttar Pradesh
B-9, Sec 26, Gautambuddha Nagar
Noida (UP)-201301.
GSTIN- 09AAKCC1790L1Z6
Phone : 8595112250
Email: info@cosmicsignals.com
Cosmic Signaling ​© 2021